Fall River, MA – New Parkour Gym – July Construction Update – Coming August 2015

Fall River, MA – New Parkour Gym – July Construction Update – Coming August 2015

For those in RI and MA who haven’t liked us on Facebook yet to get the most up-to-date information, AMP Academy is making some serious progress!

At this point in construction, 21 awesome people have volunteered over 500 hours of their time! ¬†And for that, this post can’t continue without an enormous thanks to my amazing friends who’ve helped with this dream every step of the way. ¬†Without you, this wouldn’t be possible.

That said, check out some of the progress photos below, and be sure to tell your friends: AMP is coming!

This is where we stood last you heard.IMG_3625

Now check out the progress since then!

052515
Time to clean up after making a mess.
053115 Second Day of Framing
Looks much better after some cleaning.
060615 Finished Framing
Ahh, finally finished up the framing, getting the walls nice and high for additional privacy.
061115 Blueprints
Got some fabrication drawings for the obstacles. These things are professionally designed!
061115 Box 1 Above
The first box is in place! Look at the pile of plywood way in the back. It doesn’t look like that anymore.
053115 Old Hardwood
The line class room deserves much nicer flooring than this. Let’s see what we can do.
060615 New Hardwood
Now that looks MUCH better!
061115 Floors and Obstacles 1
The padded flooring came in and more obstacles were put in place!
061115 Floors and Obstacles
Nothing lagged in place yet. Still had some time to make final layout design decisions.
061415 Floor and Obstacles 1
A few more pieces up and prepared to be finalized.
062215 Closing Up
Almost everything lagged in place and closed up! Now it’s starting to really looks like a parkour gym!
062715 Line Drywall
Popping up the drywall really makes this room look almost ready for classes.
Bars
The pipes came in and the pipes went up. The “Pipe Dream” obstacle is mostly done!
062815 Salmon
The salmon ladder went up and there’s a puppy visitor. See if you can find him.
062815 Closing Drywall Bars
Take a look at the pile of plywood now! Nearly a third of what it was. We’re getting closer and closer every day!

Thanks for coming along on the journey through construction.

There’s still more to go, so be sure to like us on Facebook for the most up-to-date information!

 

AMP is coming

August comes soon.